Client: Rio Tinto Location: Pilbara, WA Duration: July 2012 – May 2014 Market: Resources – Iron Ore Capabilities: E&I Powerlines
Scope of Work:
SCEE Electrical was engaged to design, construct and commission the existing 33kV overhead line distribution supplying various mine facilities from the Yandi 220kV Switchyard. SCEE Electrical installed new dual and single circuit lines and removed redundant sections across 30kms.