SCEE Electrical LNG
< Back to projects

CHEVRON WHEATSTONE LNG

Client: Bechtel Australia Pty Ltd
Location: Onslow, WA
Duration: April 2016 – April 2019
Market: Resources – LNG
Capabilities: E&I Construction

Scope of Work:

KSJV (50:50 joint venture between SCEE Electrical and Kentech) were engaged by Bechtel to complete the electrical and instrumentation installation services for the downstream portion of the Chevron-operated Wheatstone LNG processing facility.