Client: Rio Tinto Location: Cape Lambert, WA Duration: Jan 2011 – Dec 2014 Market: Resources – Iron Ore Capabilities: Overhead Line and E&I Construction
Scope of Work
The Cape Lambert Port Expansion Phases A and B included five packages undertaken by SCEE Electrical to complete the overhead line (OHL) and the electrical and instrumentation (E&I) works required. SCEE Electrical worked on a new port facility adjacent to the existing Cape Lambert Port facility including a new 100Mtpa train infrastructure, stockyard, ship loading facilities and a new wharf. SCEE Electrical were also responsible for the design, supply and construction of the main 33kV OHL and HV cable feeds to the site’s two major 33kV sub stations.