Client: Anglo Gold Ashanti Location: North East of Kalgoorlie, WA Duration: September 2012 – September 2013 Market: Resources – Gold Capabilities: E&I and OHL Construction
Scope of Work:
SCEE Electrical were engaged to design, construct and commission the overhead line (OHL) infrastructure and install the Electrical and Instrumentation works for the Tropicana Gold Mine’s process plant and bore fields. Located 330kms northeast of Kalgoorlie in WA, the project was situated an eight hour drive from the nearest town making it one of SCEE Electrical’s most remote projects to date.